[1]
2025. IMPROVEMENT OF THE PHOTOGRAMMETRIC SURVEY METHOD IN UNDERGROUND MINE WORKINGS CONSIDERING HUMIDITY (CASE STUDY OF GISSARAK HPP TUNNELS). “UZBEKHYDROENERGETICS” scientific and technical journal. 7, 2 (Sep. 2025), 100–106.