(1)
IMPROVEMENT OF THE PHOTOGRAMMETRIC SURVEY METHOD IN UNDERGROUND MINE WORKINGS CONSIDERING HUMIDITY (CASE STUDY OF GISSARAK HPP TUNNELS). UZBEKHYDROENERGETICS 2025, 7 (2), 100-106.