[1]
“IMPROVEMENT OF THE PHOTOGRAMMETRIC SURVEY METHOD IN UNDERGROUND MINE WORKINGS CONSIDERING HUMIDITY (CASE STUDY OF GISSARAK HPP TUNNELS)”, UZBEKHYDROENERGETICS, vol. 7, no. 2, pp. 100–106, Sep. 2025, Accessed: May 02, 2026. [Online]. Available: https://uzbekhydroenergetics.uz/index.php/uz/article/view/87